US$ 1119500.00
Pay in 4 interest-free payments of $11.24 Learn more
Or lower the sides ready for the train to pass over the top
in a leather jacket sits close by
All details are of high-quality eco-friendly plywood and pre-cut with a precise laser
Maximum load capacity: up to 5A
Typical loads were short steel sections
4P-020-411 GWR Toplight Mainline City GWR All Brown All Third 3909 Set 5 Space-Kit Or lower the sides readyThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 1119500.00
US$ 994500.00
US$ 994500.00
US$ 1049000.00
US$ 1119500.00
US$ 245.00
US$ 295.00
US$ 285.00
US$ 325.00
US$ 31.00
US$ 969500.00