376-200B LNER Thompson First Corridor LNER Teak Effect 141 OT Length 3 x 25mm
Description
Length 3 x 25mm
6 metres of twinned each of our stranded 32 gauge decoder wire – When it comes to installations
The track cleaning vehicle supplys a small amount of cleaning fluid and then polishes the rails with the rotating pads
ITEM NUMBER 1225
but the design makes it easy to combine additional kits (sold separately) to build a longer or wider bridge if needed
376-200B LNER Thompson First Corridor LNER Teak Effect 141 OT Length 3 x 25mmEntering traffic just after World War Two, the Thompson coaches were the last mainline corridor coaches to be built by the LNER, and indeed examples continued to be outshopped after Nationalisation in 1948. Utilising steel panelling, a departure from the teak panelling traditionally seen on coaches built by the LNER and its predecessors, the Thompson coaches were sleek and modern in appearance. Whilst much of the fleet would remain in service until
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 22.00
US$ 14.99
US$ 14.99
US$ 1699.50
US$ 11000.00
US$ 7000.00
US$ 2617.50





