US$ 50.00
Pay in 4 interest-free payments of $3.75 Learn more
CO2 and O2 Volume
Response Times - T63<15s
The SS Hurricane® has been installed in hundreds of remediation sites using pump and treat systems
Epichlorohydrin + Cr VI Cl2 Cl2+ o-tolidine yellow orange reaction product
With the convenient internal battery charger indicator
Grundfos Redi-Flo 2 Cooling Shroud Rental Rental Term:Weekly CO2 and O2 VolumeA pump cooling shroud must be installed on the pump when using the pump in a larger than 2" diameter well casing. The cooling shroud isolates the screened suction interconnector and forces water to circulate past the pump motor. If using the pump cooling shroud in a larger than 2" monitoring well, be sure to install the shroud correctly. The set screws should be anchored to the pump housing, not the screen. The screws are mainly intended to keep the
US$ 50.00
US$ 96.00
US$ 120.00
US$ 135.00
US$ 244.50
US$ 134.50
US$ 62.00
US$ 175.00
US$ 50.00
US$ 200.00
US$ 112.50